Before any ground disturbance: Contact local 811, wait for all utility mark-out responses, and separately locate private underground lines.

How Should the CMU Wall-Base Collection Trench Be Sized and Built?

Build the perimeter collection trench beside—never below—the concrete masonry unit (CMU) footing using coarse washed stone, an oversized smooth-wall rigid pipe, and zero geotextile sock around the pipe.

Component Iron-Ochre Specification Hydraulic / Physical Rationale
Pipe wall type Smooth rigid PVC (Manning n ~0.011) or dual-wall smooth-interior HDPE (n ~0.012) Avoids single-wall corrugated HDPE (n 0.016–0.024) whose interior ribs trap biofilm
Pipe internal diameter (ID) 4 in (102 mm) minimum; 6 in (152 mm) preferred in heavy ochre zones Preserves cross-sectional flow area as orange-brown slime coats the invert
Perforation / slot geometry 1/2 to 5/8 in (13 to 16 mm) drilled holes or wide rigid slots Prevents bacterial slime from bridging narrow (<1/8 in / 3 mm) factory micro-slots
Perimeter filter sock Omitted (zero fabric wrapped around pipe or wall-base interface) Prevents rapid biological blinding at the highest-velocity entry surface
Aggregate envelope #57 washed angular stone (3/4 in / 19 mm nominal, zero fines); loose weight ~1.35–1.45 US short ton/yd^3 (2,700–2,900 lb/yd^3, verify quarry weight) Maintains large inter-stone void spaces; net stone volume = stone cross-section * length - pipe outer-diameter (OD) volume
Trench slope 0.5% to 1.0% continuous fall (0.06 to 0.12 in/ft; approx 1/16 to 1/8 in/ft) Sustains flushing velocity toward the sump without bellies where slime settles
Cleanout access 4 in (102 mm) vertical risers with removable caps at every 90-degree corner and every 40–50 ft (12–15 m) Allows direct mechanical jetting and high-volume water flushing
Sump basin Vertical-wall sealed basin: 18-in ID (~1.10 gal/in) or 24-in ID (~1.96 gal/in) Provides storage buffer and accessible pump removal for periodic desludging

Where hollow CMU block cores hold perched water, drill relief weep holes into the lowest exposed cores just above the footing shelf so water drains directly into the open #57 stone bed and rigid channel. Do not cover these core weep holes with filter fabric.

Why Do Filter Fabrics and Narrow Slots Fail in Iron-Ochre Water?

At the CMU wall-base interface, omit all pipe socks, specify smooth-wall rigid pipe with 1/2 to 5/8 in (13 to 16 mm) openings, keep the trench invert at or above footing-bottom elevation, and size the sump discharge against total dynamic head (TDH) so ochre slime does not stagnate in the channel. For detailed bacterial fouling mechanisms, sludge sampling to distinguish iron ochre from gritty silt, and outlet or pipe-belly diagnostics, see Iron Ochre Clogging in a French Drain.

What Pre-Work and Installation Steps Control Iron-Ochre Seepage?

Establish a legal discharge outlet and complete all utility locates before any slab cutting, probing, or excavation begins.

  1. Complete utility locates first (zero depth exceptions): Contact local 811, wait for all utility mark-out responses, and separately locate all private underground lines (electric, gas, irrigation, private laterals) BEFORE any digging, slab breaking, grading, or probing—with zero depth exceptions. If standing water is present on the basement floor, de-energize affected circuits first and never step into standing water contacting energized electrical equipment.
  2. Establish a legal discharge outlet: Confirm the sump discharge routes to a legal surface outlet, storm drain (where locally permitted), or approved on-site dispersion area. Stormwater and sump lines must never enter municipal sanitary sewers, basement floor drains tied to sanitary lines, or septic systems, and must not discharge onto neighboring lots or ice public walkways.
  3. Inspect CMU wall integrity and footing depth: Check the CMU wall for bowing, leaning, step-cracking displacement, or active settlement before disturbing the slab edge. Locate the footing top and side without excavating below footing bearing elevation.
  4. Cut the slab and excavate beside the footing: Saw-cut the interior concrete slab perimeter and excavate a flat-bottomed trench beside the footing, keeping the trench bottom at or above footing-bottom elevation. Calculate spoil haul-off volume using soil bulking factors (1.2–1.3 for general soil, 1.3–1.4 for clay); never apply bulking factors to stone purchases.
  5. Bed the pipe and install cleanouts: Place a thin base of #57 washed angular stone, set the 4-in or 6-in smooth-wall rigid pipe at a continuous 0.5% to 1.0% slope (0.06 to 0.12 in/ft) toward the sump without bellies, and install capped 4-in flushing cleanouts at all corners and 40–50 ft (12–15 m) intervals.
  6. Backfill with #57 stone and restore the slab: Fill around and over the pipe with #57 washed angular stone (net stone volume = stone cross-section * length - pipe OD volume) with no filter sock. Lay a thin concrete-barrier sheet solely over the top of the stone to keep fresh concrete from filling stone voids, then pour the perimeter slab strip.
  7. Verify sump hydraulics against total dynamic head (TDH): Calculate pump operating head as: TDH = H_static + H_friction(Q) + H_minor(Q) Add fitting equivalent lengths (Sigma Le) into straight pipe length inside the friction formula (Hazen-Williams C=150 for new smooth PVC) or use Sigma K * v^2 / (2g); never add Le directly to static head (at Q = 0, friction = 0). Compare operating-head pump GPM against sustained storm inflow—if inflow exceeds pump output, water will still rise, and backup battery hours do not equal flood-prevention hours.

How Should Iron-Ochre Cleanouts Be Flushed and Maintained?

Flush the perimeter channel with a high-volume, low-pressure water stream on a fixed 6- to 12-month schedule (or quarterly in heavy seepage) before soft ochre slime mineralizes into hard scale.

  1. Remove the cap on the upstream-most 4-in cleanout riser and inspect the pipe invert with a flashlight for slime buildup.
  2. Insert a garden hose or low-pressure jetter nozzle and flush loosened orange-brown biofilm down the 0.5%–1.0% slope toward the sump basin.
  3. Open the sealed 18-in ID (~1.10 gal/in) or 24-in ID (~1.96 gal/in) sump basin, vacuum or pump out accumulated ochre sludge, and wipe the float switch and check-valve flapper clean.
  4. Inspect the exterior discharge termination point for ochre plugging, debris, or winter ice blockage.

DIY Scope vs. Pro / Structural Engineer Thresholds

Routine cleanout flushing, discharge outlet clearing, and basin float checks fit capable DIYers once utilities are cleared, whereas exterior wall-side excavation, deep trenching, or any sign of structural wall movement requires qualified crews or a licensed structural engineer (PE).

Scope Tier Physical Thresholds and Triggers
DIY Scope Opening and flushing existing 4-in interior cleanouts, clearing exterior surface discharge outlets, and inspecting sump float operation (after de-energizing circuits if standing water is present).
Qualified Waterproofing / Excavation Crew Any exterior excavation along foundation walls (including wall-side test holes or exposing the upper 12–18 in / 305–457 mm of a wall), trench depth >=4–5 ft (1.2–1.5 m) due to collapse risk, digging near or below foundation footing elevation (undermining risk), multi-wall hydrostatic pressure systems, or utility/permit crossings.
Licensed Structural Engineer (PE) Stop-Line Any CMU wall bowing, inward leaning, horizontal or step-cracking displacement, or active footing settlement exits DIY and waterproofing scope immediately and requires an on-site PE evaluation before drainage work proceeds.