Before any ground disturbance: Contact local 811, wait for all utility mark-out responses, and separately locate private underground lines.

How Do You Verify Trench Lengths, Depths, and Slope Quantities?

Measure the horizontal run along the actual discharge path and calculate required invert drops using slope_% = 100 * rise / horizontal_run to confirm that proposed trench depths match gravity-flow physics and legal outlet elevations. A flat lot cannot maintain continuous gravity drainage with a uniform 12 in (305 mm) trench depth; the downstream invert must drop 0.12 in/ft (10 mm/m) for a 1% slope or 0.24 in/ft (20 mm/m) for a 2% slope (1/8 in/ft and 1/4 in/ft are common field approximations).

  • Pipe slope and trench depth: Over a 100 ft (30.5 m) run at 1% slope, the pipe invert drops 12 in (305 mm), meaning a trench starting at 12 in (305 mm) deep reaches 24 in (610 mm) deep at the outlet unless the ground surface falls naturally at the same rate.
  • Pipe roughness assumptions: Verify whether the proposal specifies smooth-wall PVC (n ~ 0.011), dual-wall smooth HDPE (n ~ 0.012), or single-wall corrugated HDPE (n = 0.016-0.024, using the conservative upper bound for sizing), because higher roughness requires either steeper slope or larger internal diameter (ID) to carry the same peak runoff (Q_cfs = (1.486/n) * A * R^(2/3) * S^(1/2)).
  • Surface grading perimeter: Under the IRC 2024 R401.3 baseline, permeable ground within the first 10 ft (3.05 m) of a foundation requires >=6 in (152 mm) of fall (5%), or an approved swale/drain where obstructed, and impervious surfaces within 10 ft (3.05 m) require >=2% (0.24 in/ft) fall; verify local adopted code and continuous slope without bellies.
  • Legal outlet check: Confirm the proposal terminates at a legal discharge outlet first—stormwater and sump lines must never enter municipal sanitary sewers, basement floor drains tied to sanitary lines, or septic systems, and must avoid discharging onto neighboring lots or icing public walkways.

How Do You Audit Aggregate Tonnage and Spoil-Haul Volumes?

When auditing material quantities, watch for bid red flags such as applying soil bulking factors (1.2-1.4) to stone purchases, charging gross trench volume without subtracting 4-in or 6-in pipe outer-diameter (OD) displacement, or omitting clay spoil haul-off. If a proposal includes a dry well, confirm storage uses usable porosity n (void volume / total volume, not geotechnical void ratio e) and pairs any infiltration pit with design-depth percolation testing (<0.5 in/hr flags high overflow risk) plus a legal overflow outlet. For detailed trench geometry, pipe displacement formulas, #57 washed angular stone density references, and loose spoil-volume calculations, use the French Drain Gravel and Material Calculator.

What Site Access, Labor, and Dewatering Factors Drive Bid Scope?

Audit the written scope to confirm whether narrow access, mandatory 811 and private utility potholing, temporary dewatering for high water tables, or shoring/sloping at >=4-5 ft (1.2-1.5 m) depths are priced into labor rather than left as open-ended change-order triggers. Verify that exact surface restoration tiers—such as seeded topsoil, sod, landscape beds, or saw-cut concrete/asphalt patching—are explicitly bounded in the bid. For detailed field measurements of equipment pinch points, overhead clearances, septic load limits, and spoil-removal routes, see the Excavation Access, Spoil & Site Logistics Assessment.

Step-by-Step Proposal Quantity Verification Checklist

Walk the proposed drainage alignment with a tape measure, a laser level or string line, and the contractor's written scope before signing to verify every physical quantity.

  1. Verify the discharge endpoint: Confirm the outlet is legal (daylight pop-up/mitered grate, approved storm tie-in, or code-compliant dry well with overflow) and never connects to a sanitary sewer, sanitary-tied floor drain, or septic system.
  2. Measure horizontal runs: Walk each proposed branch with a measuring wheel or 100 ft (30.5 m) tape to check linear footage against the bid.
  3. Check start and end elevations: Measure surface elevation changes along the run and confirm the proposed trench depth accommodates 1%-2% (0.12-0.24 in/ft) continuous fall without bellies.
  4. Audit net #57 stone tonnage: Compute gravel net volume = stone cross-section * length - pipe OD volume, divide cubic feet by 27 for cubic yards, and multiply by 1.35-1.45 to verify proposed US short tons (2,700-2,900 lb/yd^3).
  5. Audit spoil haul-off and reuse: Calculate excavated bank volume, apply 1.2-1.3 (general) or 1.3-1.4 (clay) bulking, and confirm whether spoil is hauled away or used to build up the >=6 in (152 mm) fall in the first 10 ft (3.05 m) around the foundation.
  6. Verify access, utilities, and restoration: Confirm 811 and private-line locating responsibilities, identify exact hand-digging zones, check whether temporary dewatering is included if water is encountered, and list exact restoration boundaries (topsoil/seed, sod, or hardscape patching).

Common Proposal Quantity Failure Modes

Most drainage bid discrepancies stem from misapplied volume math, unstated hand-digging constraints, or missing gravity-slope depth allowances.

  • Bulking applied to stone purchases: Multiplying net gravel cubic yards by 1.2-1.4 inflates proposed stone tonnage by 20%-40%; bulking applies only to excavated soil haul-off.
  • Omitted pipe displacement: Calculating trench gravel as width * depth * length without subtracting pipe OD volume overstates #57 stone requirements, especially for 6 in (152 mm) or dual-pipe runs.
  • Unpriced hand-excavation zones: Proposals written assuming full-run machine trenching often trigger change orders when crews hit 811-marked utility corridors, private irrigation lines, or narrow 30-36 in (760-915 mm) side-yard gates.
  • Flat-trench assumptions: Specifying a constant 12-18 in (305-457 mm) depth on a flat yard leaves no room for 1%-2% (0.12-0.24 in/ft) pipe slope, creating standing-water bellies or forcing mid-job deeper excavation.
  • Unverified dry-well percolation: Proposing infiltration pits without design-depth perc testing (<0.5 in/hr flags high overflow risk) or a legal overflow outlet leads to surface backup during sustained storms.
  • Missing restoration and dewatering boundaries: Leaving spoil disposal, sod/hardscape patching, or groundwater pumping out of the written scope shifts unexpected labor onto the homeowner mid-project.

DIY Scope vs. Pro / Structural Engineer Thresholds

Homeowners can generally audit bid quantities and perform shallow surface grading, while deep trenches, footing-adjacent excavation, utility crossings, and structural wall distress require licensed professionals.

  • DIY Scope (Audit & Shallow Surface Work): Measuring horizontal runs, checking 1%-2% (0.12-0.24 in/ft) surface slopes, verifying >=6 in (152 mm) fall in the first 10 ft (3.05 m) per IRC 2024 R401.3, and hand-digging shallow surface swales or downspout extensions only after contacting local 811, waiting for utility responses, and separately locating private underground lines.
  • Licensed Drainage / Excavation Pro Thresholds: Any trench reaching >=4-5 ft (1.2-1.5 m) deep (trench collapse risk requiring shoring, sloping, or benching), any excavation near or below foundation footing elevation (risk of undermining structural support), multi-wall hydrostatic pressure, active groundwater dewatering, or work crossing utility corridors and municipal permit/right-of-way boundaries.
  • Electrical / Standing Water Stop-Line: Never step into standing water contacting energized electrical equipment.
  • On-Site Licensed Structural Engineer (PE) Stop-Line: Wall bowing, leaning, step-cracking displacement, or active settlement exits DIY and drainage/waterproofing contractor scope and requires an on-site licensed structural engineer (PE).