Before any ground disturbance: Contact local 811, wait for all utility mark-out responses, and separately locate private underground lines.

What inputs and outputs does the Rain Garden Calculator use?

The calculator maps seven exact site and hydraulic inputs to storm volume, required ponding footprint, catchment ratio, and—only after site checks are marked verified—surface drain-down hours.

Calculator Inputs and Constraints

Input Label Type Default Min Max / Options Engineering Role
Contributing roof or hardscape area (ft²) Number 1000 1 No upper cap Horizontal projected roof or paved catchment
Design storm depth (in) Number 1 0.1 No upper cap Target 24-hour or local design rainfall depth
Runoff coefficient C Number 0.95 0.1 1.0 Fraction of rainfall converted to runoff (0.90–0.95 typical roof)
Surface ponding depth (in) Number 6 3 12 Vertical water depth stored above the mulch/soil bed
Measured design-bottom infiltration (in/hr) Number 0.5 0 No upper cap Field percolation rate at planned basin bottom elevation
Design-rate reduction factor Number 0.5 0.1 1.0 Safety multiplier for long-term siltation and compaction
Site setbacks, groundwater & overflow checks Select Unknown / not verified (0) — Unknown / not verified (0), Verified (1) Gates drain-down hour output and unverified checklist alert

Calculator Outputs and Alert Thresholds

Output or Alert Condition Unit / Trigger Exact Behavior
Design storm volume Always shown gal and ft³ Reports total runoff volume entering the basin
Required ponding footprint Always shown ft² Flat bottom ponding area needed for the selected depth
Basin-to-catchment ratio Always shown % Percentage of contributing catchment occupied by the basin
Estimated surface drain-down Shown ONLY when Verified (1) hr or text Reports hr (or 'No drain-down by infiltration at this rate' when perc == 0); hidden when Unknown / not verified (0)
Unverified site alert Site setbacks, groundwater & overflow checks = 0 Status warning Outputs footprint/volume only and requires >= 10 ft foundation setback, septic/well setbacks, seasonal high groundwater/bedrock clearance, and a legal overflow spillway
Slow-infiltration alert (advisory) Measured design-bottom infiltration (in/hr) < 0.5 < 0.5 in/hr (12.7 mm/hr) Flags slow infiltration (30 hr at 0.4 in/hr, 0.5 factor, 6 in depth still stays under 48 hr); notes local design criteria where engineered bioretention soil or an optional perforated underdrain may apply
Slow drain-down alert (danger) Verified (1) AND Estimated surface drain-down > 48 hr > 48 hr Flags standing-water mosquito breeding and plant root-rot risk

How do storm volume, ponding depth, and infiltration formulas determine basin footprint?

The calculator converts horizontal projected catchment area and storm depth into cubic feet and US gallons, divides volume by ponding depth in feet to size the basin footprint, and divides ponding depth by the factored infiltration rate to check drain-down time.

All widget calculations use the following plain-text equations:

stormFt3      = area * (stormDepth / 12) * coefficient
stormGal      = stormFt3 * 7.48052
basinAreaSqft = stormFt3 / (pondingDepth / 12)
ratioPct      = (basinAreaSqft / area) * 100
designPerc    = perc * reduction
drainHours    = pondingDepth / designPerc   (only when Verified = 1; Infinity if designPerc = 0)

At the 1,000 ft² (92.9 m²), 1 in (25.4 mm), C = 1.0 hydraulic anchor, runoff equals 83.333 ft³ (2.36 m³) and 623.38 gal (2,360 L). At 6 in (0.50 ft / 152 mm) ponding depth, that volume requires 166.67 ft² (15.48 m²) of flat ponding area (16.67% ratio). Using the default residential roof assumption C = 0.95, the same 1,000 ft² catchment produces 79.17 ft³ (592.21 gal) and requires 158.33 ft² (15.83% ratio) at 6 in ponding depth.

Ponding Depth and Drain-Down Sensitivity (1,000 ft², 1 in storm, C = 0.95, 592.21 gal / 79.17 ft³)

Ponding Depth Required Ponding Footprint Catchment Ratio Drain-Down at designPerc = 0.25 in/hr (perc = 0.5, reduction = 0.5) Drain-Down at designPerc = 0.15 in/hr (perc = 0.5, reduction = 0.3)
3 in (76 mm) 316.67 ft² (29.42 m²) 31.67% 12.0 hr (Pass <= 48 hr) 20.0 hr (Pass <= 48 hr)
6 in (152 mm) 158.33 ft² (14.71 m²) 15.83% 24.0 hr (Pass <= 48 hr) 40.0 hr (Pass <= 48 hr)
9 in (229 mm) 105.56 ft² (9.81 m²) 10.56% 36.0 hr (Pass <= 48 hr) 60.0 hr (Danger > 48 hr)
12 in (305 mm) 79.17 ft² (7.35 m²) 7.92% 48.0 hr (Pass boundary) 80.0 hr (Danger > 48 hr)

Manual pre-calculation checks outside the widget:

  • Horizontal catchment projection: Measure the horizontal footprint of the roof or hardscape draining to the target downspout(s) in ft², not sloped shingle length along the rafters.
  • Side-slope grading allowance: The widget outputs flat ponding footprint (basinAreaSqft). When laying out the perimeter on site, add horizontal width around the flat floor for 3:1 or 4:1 vegetated side slopes so the top rim fits within your available yard space.
  • Peak flow vs. storm volume: For piped downspout inlets leading into the garden, verify pipe delivery capacity separately—1,000 ft² at 1 in/hr (C = 1.0) delivers 10.39 GPM (Q_gpm = (C * i_in_hr * A_sqft) / 43,200 * 448.831), while higher short-duration rainfall intensities govern inlet erosion protection.

How do you measure bottom infiltration and verify site clearances before sizing?

Every drain-down calculation remains invalid until underground utilities are marked, a legal overflow outlet is established, setbacks and groundwater clearance are confirmed, and percolation is measured at the planned excavation floor. All steps below are field-verification checks performed outside the calculator before entering final numbers.

  1. Contact local 811, wait for all utility mark-out responses, and separately locate private underground lines before any digging, grading, or probing—with zero depth exceptions. Even a narrow test hole for percolation testing or shallow surface sod stripping can strike shallow fiber, irrigation, low-voltage lighting, or invisible-fence lines that public 811 locators do not mark.
  2. Establish a legal discharge outlet for the overflow spillway and any underdrain first. Route excess storm flow toward an approved lawn swale, street drainage system, or legal yard discharge point; stormwater lines must never enter municipal sanitary sewers, basement floor drains tied to sanitary lines, or septic systems, and must never discharge onto neighboring lots or ice public walkways.
  3. Verify foundation, septic, well, and water-table clearances. Keep the basin edge at least 10 ft (3.0 m) downslope from house foundations (verify local adopted code for stricter setbacks), maintain required setbacks from septic leach fields and potable wells, and confirm seasonal high groundwater and bedrock stay clear below the basin floor or amended soil bed.
  4. Confirm lot grading away from the house. Check that permeable ground within the first 10 ft (3.0 m) of the foundation falls at least 6 in (5% slope per IRC 2024 R401.3 baseline, or >= 2% on impervious surfaces) into an approved swale or downspout lead feeding the rain garden, with continuous slope and no bellies.
  5. Measure percolation at the design bottom elevation, not at the grass surface. Excavate the test hole to the actual finished ponding floor (or bottom of amended bioretention media if excavating deeper), pre-soak the soil walls and bottom, and record steady water drop in in/hr over multiple readings.
  6. Apply a conservative reduction factor (0.5 default) and toggle Verified (1). Root mats, leaf litter, and fine sediment reduce field infiltration rates after construction. Keep Design-rate reduction factor at 0.5 (or lower in silty soils) and switch Site setbacks, groundwater & overflow checks to Verified (1) only after steps 1–5 pass.

For full basin excavation profiles, amended soil mixes, and underdrain pipe installation details, see the rain gardens system guide or return to the drainage calculators library.

What drainage failures occur when rain garden sizing or soil checks are skipped?

Skipping slow-soil local criteria checks, ignoring the 48 hr drain-down ceiling, or placing an unverified basin too close to a structure converts a storm detention feature into a chronic saturation hazard.

  • Ponding stagnation in slow clay (< 0.5 in/hr): Compacted clay subsoils hold water above the 48 hr threshold, suffocating plant roots, breeding mosquitoes, and turning mulch beds sour. When measured percolation falls below 0.5 in/hr, surface ponding area alone may not meet local drawdown targets—check local design criteria where engineered bioretention media or an optional perforated underdrain routed to a legal outlet may apply (see Wisconsin DNR Stormwater Technical Standards). Zero percolation yields 'No drain-down by infiltration at this rate'.
  • Unfactored percolation assumptions (reduction = 1.0): Designing at raw first-hour perc rates (1.0 factor) leaves zero margin for sediment fines carried off roof shingles or driveways. A 6 in basin that drains in 24 hr on day one reaches the 48 hr ceiling if surface pores lose half their conductivity and exceeds 48 hr with any further silt clogging.
  • Missing overflow spillway: Every storm exceeding the Design storm depth (in) input will overtop the rim. Without a reinforced low-point spillway directed away from the house and neighbor boundaries, overflow cuts rills through the berm and undermines surrounding turf.
  • Insufficient foundation setback (< 10 ft) or perched groundwater: Concentrating 592–623+ gal per 1,000 ft² of roof runoff inside the 10 ft foundation zone—or intersecting a seasonal high water table—feeds hydrostatic pressure directly against basement or crawlspace walls.

DIY Scope vs. Pro / Structural Engineer Thresholds

Shallow surface rain gardens sited well away from buildings fall within homeowner excavation scope once utilities are cleared, whereas deep trenches, foundation-adjacent digging, and structural wall distress cross into licensed crew or structural engineer territory.

Work Condition Physical Threshold Assigned Scope Governing Risk
Shallow basin grading & surface spillway Shallow open-yard cuts in dry, cohesive soil, >= 10 ft (3.0 m) from foundation, perc >= 0.5 in/hr, verified 811 + private locates DIY homeowner scope Cave-in risk still depends on soil cohesion and moisture; inspect trench stability from outside the cut
Deep trenching for underdrains or overflow pipes Trench depth >= 4–5 ft (1.2–1.5 m) Qualified excavation crew Trench wall collapse hazard requiring shoring or sloping
Digging near foundation walls or footings Any test hole or trench along foundation walls (including upper 12–18 in wall exposure) or near/below footing elevation Qualified waterproofing or excavation crew Risk of undermining footing bearing support or damaging perimeter drains
Utility, curb, or public right-of-way tie-ins Crossing municipal easements, street storm mains, or multi-wall hydrostatic seepage Licensed utility/drainage contractor & local permit review Code compliance, backflow prevention, and public infrastructure liability
Active water near electrical equipment Standing water contacting energized outlets, sump circuits, or panels De-energize from dry panel or call licensed electrician first Electrocution hazard—never step into energized standing water
Structural foundation wall distress Wall bowing, leaning, step-cracking displacement, or active settlement On-site licensed structural engineer (PE) Exits DIY and drainage contractor scope; requires structural evaluation before earthwork
Unverified site checks or slow clay soils Unknown / not verified (0) or perc < 0.5 in/hr without legal underdrain outlet Stop excavation until field checks pass or engineered outlet is permitted Surface flooding, septic interference, or adjacent property damage