Before any ground disturbance: Contact local 811, wait for all utility mark-out responses, and separately locate private underground lines.

How Do You Size a Dry Well Without Double-Counting Storage?

Calculate storm runoff from catchment area, design storm depth, and runoff coefficient C, then enter the net surrounding stone volume (V_stone_net, already excluding the chamber's gross displaced volume) plus the chamber's net internal capacity so excavated chamber space is never double-counted.

The calculator computes design-storm runoff directly from your entered Catchment area (ft^2), Design storm depth (in), and Runoff coefficient C using the same Rational volume equation as the roof runoff calculator (baseline anchor: 1,000 sq ft [92.9 m^2] receiving 1 in [25.4 mm] rainfall depth with C = 1.0 yields 623.38 gal [2,360 L]; residential roofs typically use C = 0.90-0.95). Do not confuse usable porosity n (V_void / V_total) with geotechnical void ratio e (V_void / V_solid), which is always larger than n (n = e / (1 + e)).

Calculator Equations (Inputs & Outputs):

  • V_storm_gal = A_sqft * (d_in / 12) * 7.48052 * C (output: Storm runoff)
  • V_stone_storage_gal = V_stone_net_ft3 * n * 7.48052
  • V_total_effective_gal = V_chamber_net_gal + V_stone_storage_gal (output: Effective storage)
  • V_stored_storm_gal = min(V_storm_gal, V_total_effective_gal) (stored fraction of the design event)
  • Overflow_gal = max(0, V_storm_gal - V_total_effective_gal) (output: Overflow volume)
  • Dual drain times (shown only when Verified is selected):
    • Time to drain from full storage (hr): 0 hr if Effective storage == 0, 'No drain-down by infiltration at this rate' when perc == 0 and storage > 0, otherwise V_total_effective_gal / Q_infil_gal_hr (e.g., 76.8 hr for a stone-only pit with 0 gal chamber + 100 ft³ net stone at n = 0.40, perc = 0.5 in/hr, reduction = 0.5, 25 ft² infiltration area = 299.22 gal).
    • Estimated drain time after this storm (hr): Drain duration for V_stored_storm_gal, assuming the dry well starts empty before the storm, ignoring infiltration during the storm, and using a constant infiltration rate across the entered effective area (e.g., 15.2 hr for 1,000 ft², 0.1 in storm, C = 0.95 yielding 59.22 gal; 0 hr when storm depth or runoff is zero even if perc == 0).

For additional dry-well pretreatment sump and sediment maintenance practices, see Penn State PHRC resources.

Pre-Calculation & Material Takeoff Equations (Calculated Outside the Widget):

  • V_excavation_ft3 = L_ft * W_ft * H_ft (rectangular pit) or 3.1416 * (D_ft / 2)^2 * H_ft (cylindrical pit)
  • V_stone_net_ft3 = V_excavation_ft3 - V_chamber_displaced_ft3 (enter this net stone volume into the calculator)
  • Stone_purchase_tons = (V_stone_net_ft3 / 27) * Stone_density_ton_per_yd3
  • Spoil_haul_yd3 = (V_excavation_ft3 / 27) * Bulking_factor
Calculator Input / Takeoff Parameter Unit / Baseline Engineering Rule
Catchment area, storm depth, & C ft^2, in, 0–1 Widget computes storm runoff directly (623.38 gal per 1,000 sq ft at 1 in, C = 1.0)
Dry well type & chamber net storage #57 stone pit or Prefab chamber (gal) Enter net internal chamber volume; subtract exterior chamber displacement from total pit volume before entering net stone
Net stone volume excluding chamber ft^3 Net aggregate volume surrounding the chamber (or full pit volume for a stone-only pit)
Usable stone porosity (n) Dimensionless (V_void / V_total, default 0.40) Must use n, never geotechnical void ratio e (V_void / V_solid)
Measured infiltration, area & reduction factor in/hr, ft^2, 0.01–1.0 < 0.5 in/hr triggers high-overflow warning; drain-down time shown only when site clearances are marked Verified
#57 washed angular stone weight (takeoff) 1.35-1.45 US short ton/yd^3 (2,700-2,900 lb/yd^3) Verify local quarry weight; applies to net stone volume only
Soil bulking factor (takeoff) 1.2-1.3 (general), 1.3-1.4 (clay) Applies to excavated spoil haul-off only, never to stone purchase

How Do Infiltration Rate and Drain-Down Time Govern Performance?

Measured percolation rates must be multiplied by an applicable design-rate reduction factor and applied only to the effective infiltration area to estimate realistic drain-down time.

Long-term sediment accumulation, geotextile interface restriction, and seasonal moisture shifts reduce field percolation rates over time. In addition, bottom clogging can leave only the wetted perimeter sidewalls active for exfiltration, so effective infiltration area (A_infil_sqft) and the design-rate reduction factor are critical calculator inputs. Both Time to drain from full storage and Estimated drain time after this storm assume an empty dry well before the storm begins, ignore infiltration occurring during the storm itself, and hold the design infiltration rate constant across the entered effective area; when storage or storm runoff is zero both report 0 hr, whereas positive volume with 0 in/hr percolation reports 'No drain-down by infiltration at this rate'.

Plain-text infiltration and drain-down equations:

  • I_design_in_hr = I_measured_in_hr * Reduction_factor
  • Q_infil_gal_hr = (I_design_in_hr / 12) * A_infil_sqft * 7.4805
  • T_drain_hr = V_stored_gal / Q_infil_gal_hr
Measured Percolation Rate / Site Status Engineering Flag Suitability Output
< 0.5 in/hr (< 12.7 mm/hr) High overflow risk / substantial overflow concern Gravity infiltration is unreliable; design requires overflow or alternative discharge
>= 0.5 in/hr (>= 12.7 mm/hr) Conditional — not automatic approval Requires design-bottom perc test, water-table/bedrock clearance, setbacks, and legal overflow
Critical site conditions unknown Incomplete field verification Quantity and volume estimates only; no construction suitability verdict

What Site Checks Are Required Before Approving Infiltration?

A passing percolation rate alone never approves a dry well; you must verify utility clearances, legal overflow routing, design-bottom soil horizons, groundwater and bedrock depth, and structural setbacks before excavating.

  1. Clear underground utilities first: Contact local 811, wait for all utility mark-outs and responses, and separately locate private underground lines (irrigation, low-voltage lighting, outbuilding feeds, septic lines) before digging.
  2. Establish a legal overflow outlet: Route surcharge overflow to a compliant surface daylight point or approved storm system. Never connect stormwater or dry well overflow to municipal sanitary sewers, sanitary-tied basement floor drains, or septic systems, and avoid discharging onto neighboring lots or icing public walkways.
  3. Test percolation at design-bottom elevation: Run the percolation test at the exact proposed bottom depth of the dry well, not at topsoil depth where organic matter skews results.
  4. Verify groundwater and bedrock clearance: Confirm vertical separation above the seasonal high water table and any bedrock or impermeable hardpan layer.
  5. Confirm horizontal setbacks: Verify local code setbacks from building foundations, basement or crawlspace walls, property lines, wells, and septic tanks or leach fields.
  6. Calculate net stone and spoil separately: Order #57 washed angular stone using V_stone_net_ft3 (1.35-1.45 ton/yd^3), and size dump/haul-off capacity using V_excavation_ft3 multiplied by the soil bulking factor (1.2-1.3 general, 1.3-1.4 clay).

What Are the Common Dry Well Sizing and Installation Failure Modes?

Most residential dry well failures stem from double-counting occupied volume, misusing geotechnical void ratio e, or sending unfiltered roof sediment into the infiltration stone.

  • Double-counting chamber displacement: Treating the entire excavation as stone-filled while also adding the chamber's internal capacity inflates calculated storage.
  • Using void ratio e instead of porosity n: Plugging e = V_void / V_solid into the stone storage formula overstates water capacity compared to n = V_void / V_total.
  • Applying soil bulking to stone orders: Multiplying stone volume by 1.2-1.4 over-orders aggregate; bulking applies strictly to excavated spoil haul-off.
  • Testing surface soil only: Measuring infiltration near grade misses shallow clay lenses, compacted subsoils, or bedrock at the actual dry well bottom.
  • Omitting debris screening and geotextile separation: Unfiltered roof grit, leaves, and surrounding fine soil migrate into stone voids, blinding the bottom and walls prematurely.
  • Omitting an emergency overflow: Without a legal surface relief (such as a pop-up emitter or graded swale), storms exceeding storage capacity back up into roof leaders and discharge against the foundation.

DIY Scope vs. Pro / Structural Engineer Thresholds

Excavations >= 4-5 ft (1.2-1.5 m) deep carry trench collapse risk requiring professional shoring or trench-box protection, digging near or below foundation footing elevation risks undermining bearing support, and any wall bowing, leaning, step-cracking displacement, or active settlement exits DIY scope and requires an on-site licensed structural engineer (PE). Sites with utility or easement crossings or percolation < 0.5 in/hr (< 12.7 mm/hr) also require licensed contractor permitting or civil drainage design. For contractor deliverables, non-smeared excavation, #57 washed stone specifications, spoil haul-off, pre-backfill inspections, and warranty coverage, see Dry Well & Subsurface Infiltration Scope of Work.